Order of Service at the Installation of Rev. Alfred Grant Walton as Pastor of The First Congregational Church
Title
Order of Service at the Installation of Rev. Alfred Grant Walton as Pastor of The First Congregational Church
Subject
Description
Program from the installation service for Alfred Grant Walton as the pastor of the First Congregational Church in Stamford, Connecticut on June 12, 1917. Reverend Walton is the seventeenth Pastor of record for the Congregational Church
Creator
Congregational Church (Stamford, Conn.)
Publisher
The Ferguson Library
Date
1917-06-12
Rights
The Ferguson Library has determined, to the best of its ability based on available information, that this material is unlikely to be protected by copyright interests and is in the public domain. Copyright status is, however, often difficult to determine with certainty, so restrictions may still exist. You are solely responsible for obtaining whatever permission may be needed to use this material.
Format
text/pdf
Language
English
Type
Identifier
FL.churchpamphlets.041
Coverage
Stamford (Conn.)
20th century
Original Format
Paper - folded brochure
Collection
Citation
Congregational Church (Stamford, Conn.), “Order of Service at the Installation of Rev. Alfred Grant Walton as Pastor of The First Congregational Church,” Ferguson Library Digital Archives, accessed April 30, 2025, https://www.fergusonlibraryarchive.org/document/FL.churchpamphlets.041.
Embed
Copy the code below into your web page